Dorji, T., Sharma, D., & Yangzom, T. (2025). Case Study on the Failure of 400kv XLPE Cables Termination of Tala Hydropower Plant through Electromagnetic Transient Analysis Using Mipower Software. Zorig Melong | A Technical Journal of Science, Engineering and Technology, 8(2), 25-31. https://doi.org/10.17102/zmv8.i2.003