Dorji, Thinley, Deepen Sharma, and Tshering Yangzom. “Case Study on the Failure of 400kv XLPE Cables Termination of Tala Hydropower Plant through Electromagnetic Transient Analysis Using Mipower Software”. Zorig Melong | A Technical Journal of Science, Engineering and Technology 8, no. 2 (August 17, 2025): 25–31. Accessed August 18, 2025. http://103.133.216.217/index.php/zm/article/view/147.